Bridge
Usage Scenario
This Step is a general data transmission Step. It is usually used when data needs to be transferred across projects to achieve collaboration between projects.
Parameter Description
| Parameter | Description |
|---|---|
Port List |
Description: This parameter is used to set the output data port for the project to receive data. Instruction: Click the Open the editor button and configure Step ports in the Port Setting Assistant window. The detailed instructions are as follows:
|
Max Timeout [s] |
Description: This parameter specifies the maximum wait time for data transmission. An error will occur if the timeout occurs.
|
Stop Early |
Description: This parameter is used to control whether the called project stops executing immediately after data transmission.
|
Run Last Project in Current Thread |
Description: Once this option is selected, the execution complexity of nested multi-layer projects can be reduced.
|