General Parameters of Non-Move Steps

You are currently viewing the documentation for version 1.8.2. To access documentation for other versions, click the "Switch Version" button located in the upper-right corner of the page.

■ To use the latest version, visit the Mech-Mind Download Center to download it.

■ If you're unsure about the version of the product you are using, please contact Mech-Mind Technical Support for assistance.

Pre Plan Out Port
Planning: The process when the software attempts to find a collision-free path that the robot can follow to reach the target position.

For Steps that may interrupt the planning (i.e. Check DI), the software cannot predict the actual exit port of these Steps during planning. Therefore, you can specify a pre plan out port, allowing the software to follow a complete planning along the branch after the specific exit port. Typically, the exit port that the Steps are most likely to take during actual runtime will be specified.

We Value Your Privacy

We use cookies to provide you with the best possible experience on our website. By continuing to use the site, you acknowledge that you agree to the use of cookies. If you decline, a single cookie will be used to ensure you're not tracked or remembered when you visit this website.