Project List

You are currently viewing the documentation for the latest version (2.1.0). To access a different version, click the "Switch version" button located in the upper-right corner of the page.

■ If you are not sure which version of the product you are currently using, please feel free to contact Mech-Mind Technical Support.

Project list displays opened solutions and projects and their status, including interface communication status and autoload status.

Area 1 is the solution name, area 2 is the project name, as shown in below.

projects project 1
  • Hover the cursor over projects icon 1 to check the introduction to solution and project.

  • Click projects icon 1 to check the user manual on “solution”.

Solution Shortcut Menu

Select a solution, right-click it to choose actions such as Close Solution, Open Solution in Explorer, Autoload Solution, Rename Solution, etc. For the detailed operation, please refer to Operation Guide: Solution Guide.

projects project 2

The options and their description are as follows.

Option Description

Close Solution

Close current solution

Open Solution in Explorer

Open the folder in which the solution is located

New Project

Add a project in the solution

Autoload Solution

Autoload all projects in the solution

Rename Solution

Rename the solution

Solution Access Control

Enable access control for the solution and manage permissions for different roles

Back up Solution

Back up the solution content within specified time range to a specified path

Reset Project IDs

Reset the adjusted project IDs

Project Shortcut Menu

Select a project, right-click it to choose actions such as Close Project, Open Project in Explorer, Autoload Project, Rename Project, etc. For the detailed operation, please refer to Operation Guide: Project Guide.

projects project 3

The options and their description are as follows.

Option Description Shortcut

Close Project

Close current project

Ctrl+W

Open Project in Explorer

Open the folder in which the project is located

N/A

Rename Project

Rename the selected project

N/A

Delete Project

Delete the selected project

N/A

Back up Solution

Back up the solution content within specified time range to a specified path

N/A

When both a solution and an unassigned project are opened, you can select Move/Copy to Current Solution or Pack as Solution.

projects project 4

The options and their description are as follows.

Option Description

Move to Current Solution

Move the selected project into the currently opened solution

Copy to Current Solution

Copy the selected project into the currently opened solution

Pack as Solution

Save the current unassigned project to a solution

We Value Your Privacy

We use cookies to provide you with the best possible experience on our website. By continuing to use the site, you acknowledge that you agree to the use of cookies. If you decline, a single cookie will be used to ensure you're not tracked or remembered when you visit this website.