Project Migration Guide

You are viewing an old version of the documentation. You can switch to the documentation of the latest version by clicking the top-right corner of the page.

1.8.0 Project Migration Guide

Migration from 1.7.X Project to 1.8.0 Project

Starting from version 1.8.0, Mech-Center will only run as a background communication component of the vision system when Mech-Vision or Mech-Viz is launched. Specifically, Standard Interface communication and Adapter communication should be configured in Mech-Vision, while Master-Control communication should be configured in Mech-Viz.

Project Type (Divided According to the Communication Modes in Actual Use)

Actions after Software Upgrade

Standard Interface communication, Adapter communication

Keep the same usage as 1.7.X version.

Master-Control communication

Reset configuration of Master-Control communication in Mech-Viz by following these steps:
1. Start Mech-Viz, and select the robot model that corresponds to the real robot model.
2. Click Master-Control Robot in the toolbar.
3. After setting the IP address of robots, click Connect the robot.

For more notes after the upgrade, please refer to 1.8.0 Upgrade Notes.

Migration from 1.6.X Project to 1.8.0 Project

It is recommended to upgrade 1.6.X project to 1.7.X project first. For more detailed description, please refer to 1.7.0 Project Migration Guide.

Then you can upgrade 1.7.X project to 1.8.0 project. For more detailed description, please refer to Migration from 1.7.X Project to 1.8.0 Project.


Project Migration Guide of Previous Versions

We Value Your Privacy

We use cookies to provide you with the best possible experience on our website. By continuing to use the site, you acknowledge that you agree to the use of cookies. If you decline, a single cookie will be used to ensure you're not tracked or remembered when you visit this website.