Switch Workpiece Types
For example, when the infeed workpiece changes from workpiece A to workpiece B and a production recipe for the recognition of workpiece B already exists, you can switch the recipe on the Production Interface for the recognition of workpiece B. Please follow the steps below to operate.
-
Open the Production recipes.
Click the button in the operation area.
The Production recipes window is shown below.
-
Switch the production recipe.
As shown in the figure above, there are two production recipes in the Production recipes. According to the status, Production Recipe 1 is applied in the current production, while Production Recipe 2 is idle.
You can click the button on the right side of Production Recipe 2 to switch the current production recipe.
When the status of new production recipe is Applied, it means that the production recipe has been switched successfully. After switching the production recipe, the new one will be displayed in the Production recipe area.
-
If you want to stop applying the current production recipe, click on the right of the production recipe.
-
To check the parameters in the production recipes, you can click the button on the right side of the production recipe, and check them in the pop-up window.
-